Close
GBCSA / Resources / Case Study

Black Mountain Mining - White Office

Project Floor Area: 422m2
Date Certified: 20th September 2023
Address: ,

The offices are single storey buildings arranged around an open courtyard. A 99kW ground mounted photovoltaic

system was installed in March 2022. The monitoring period started in May 2022 for 12 months ending April 2022.

The PV system primarily supplies the office with renewable energy.


The balance of energy produced by the system is fed to the neighbouring residential area. As the system does not have battery backup, the energy supplied to the residential areas during sunlight hours is used as a credit to off set any of the White Office’s grid energy demand during non-sunlight hours.

Black Mountain Mining – White Office

, ,
Measured
Level 2

Alison Groves

Midrand, Gauteng
Green Star AP New Buildings Green Star AP Interiors Green Star AP Existing...
Read More

Hlologelo Manthose

Polokwane, Limpopo
Green Star AP Existing Building Performance Green Star AP New Buildings AP...
Read More

Added to Cart

Checkout