Rydallviews
Project Floor Area: 2729m2
Date Certified: 12th December 2014
Address: Durban, KwaZulu-Natal
• The project has reduced its peak energy demand by 37% via the installation of an ice storage chilled water system.
• The electrical system is highly efficient, with motion sensors in the office area. Sub metering of energy and water has been included in the design, and a BMS monitors all usage.
• Hot water is provided by heat pump. Water is reduced through the use of low flow fittings, and a/c condensate is collected for use in the change room toilets.
• 15 litres of fresh air is provided per second per person ensuring that there is little chance of indoor pollutant build up in the usable area
• All paints, adhesives, sealants and carpets specified in the base building contained low levels of volatile organic compounds.
Rydallviews
Durban, KwaZulu-Natal,
Office v1
Candice Manning
Centurion, Gauteng
Green Star AP New Buildings Green Star AP Existing Building Performance Gr...
Green Star AP New Buildings Green Star AP Existing Building Performance Gr...